IQ is Carbon Neutral again for 2021

Following on from our efforts in 2020, the report for 2021 has now been finalised and Information Quality are once again Carbon Neutral.

The growth of our teams and personnel, along with coming back to the office as we moved into a COVID-normal way of life, presented a challenge to keeping our workplace emissions low.

This led some of the team to really Think Outside The Box, and transition the internal Quality Assurance for MOC Drafting to a fully digital operation.

Forrestfield Airport Link Handover Management

Information Quality were requested to assist the Contractor to develop Asset Management Plans and handover documentation to enable the Contractor to meet project handover criteria and schedule.

Information Quality’s team of experienced Asset Management and project delivery professionals were able to collate and interpret the many information sources and compile a suite of documentation to meet client expectations.

Origin Energy Data Consolidation

Following from the successful program of data consolidation work performed for Origin Energy in 2020, IQ were requested to assist in the consolidation of Engineering Information across a number of disparate assets and datasets.

Information which had been compiled over years of operation under differing delivery specifications were consolidated, normalised and prepared for uploading into Origins Aveva based information Ecosystem.

BHP Olympic Dam Smart Plant Reference Data Population

Information Quality were engaged by BHP to convert Olympic Dams existing paper-based Piping and Valve Specifications into SmartPlant Reference Data (SRD) so that they can be utilised by Smart 3D for new projects. IQ provided experienced S3D Administrator and Piping Specialists to populate and validate the data to ensuring that all piping specs met Industry and Company Standards and functioned correctly when loaded to Smart 3D.

Arrow Energy Clark Energy Data Migration

Following on from the success of the Braemar 2 document transition project Arrow Energy engaged Information Quality to perform a similar transition for the Clark Energy Operations and Maintenance Manuals. IQ extracted, classified and formatted individual deliverables for the Tipton Waste Water Plant Jenbaucher Generator Sets as well as facilitated the upload to Arrows Document Management System ASSAI to ensure that the latest information was is readily available to the Business.

Arrow Energy Work Request SharePoint Site

Information Quality provide SharePoint expertise to develop an Engineering Work Request system for Arrow Energy. A new SharePoint site was created and workflows configured to manage and track engineering tasks allocated by the Central Engineering Team. Existing work requests were migrated to the new system to provide access to old request and enable close out of current requests.

Beach Energy Otway MRU Maintenance Build

Beach Energy have leveraged Information Quality’s extensive Asset Management experience to deliver a full SAP maintenance build for the Otway Mercury Recovery Unit. The end result was an exceptional outcome for newly installed and operated equipment within the business, delivering an optimised build aligned to Beach standards supporting efficient maintenance execution.

IQ Achieve Net Zero

Information Quality are pleased to announce their recent achievement as a Net Zero organization.

Information Quality’s commitment to the environment led us to adopt the Climate Clever carbon accounting system. By accurately measuring IQ’s carbon footprint…

Oil Search engages Information Quality

Oil Search has entrusted Information Quality with the delivery of MoC Backdrafting and Document Management services.

Information Quality’s long history of successful delivery and proven processes enabled us to successfully and seamlessly integrate Oil Search workflows and requirements into our established, Australian-based production centre.

IQ looks forward to a long partnership with Oil Search, delivering exceptional results and superior value.