Origin Energy – Otway Gas Plant
Prior to the sale of the Otway Gas Plant, Woodside were required to as built all critical key documentation.
This included but was not limited to the following – Piping & Instrument Drawings (P & ID’s), Single Line Diagrams, Cause & Effect Charts, Range, Alarm & Trip Schedules (RATS), Hazardous Area Drawings, Process Flow Diagrams and Wiring Diagrams.
As Woodside’s preferred drafting service provider, Information Quality was contracted to incorporate all red-line markups to produce a full set of as built critical operating drawings. Prior to this, IQ were also heavily involved in assisting Woodside to identify the extent of the Otway Gas Plant’s critical drawing list.
[/vc_column_text][/vc_column][/vc_row]